您可能会认为项目生命周期和产品生命周期相似。他们不是。作为项目经理,您应该知道这两个概念之间的区别,以使您的业务目标与您的业务目标保持一致项目目标.
由于项目生产产品然后结束,并且产品停留更长的时间,因此产品生命周期大于项目生命周期。
On the PMP exam, you may see a few questions on this topic, so understand it well.
项目生命周期
项目生命周期是项目从启动到封闭的一系列阶段。项目是为了生产产品,服务或结果而进行的,并且在交付了项目后,项目生命周期不再存在。
项目生命周期有许多阶段,每个阶段都包含这些过程组的活动:启动,计划,执行,监视和控制以及关闭。这些相通常是顺序的,可以重叠。
In the initiation phase, you develop the项目章程and identify stakeholders.
项目管理计划将在计划阶段制定,您将在执行阶段构建实际产品。
Monitoring and controlling activities happen throughout the project, although these processes can overlap or repeat.
In closing, you hand over the product to the client and close the project.
项目生命周期不一定是产品生命周期的一部分。如果项目的输出是服务或结果,则不会成为产品生命周期的一部分。
Themanbet最新版defines the project life cycles in four phases:
- 开始项目
- Organizing and preparing
- 进行项目工作
- 关闭项目
The following are some characteristics of a project life cycle:
- 风险随着项目的进行,项目启动并减少时会更高。
- Staff requirements are low at the beginning of the project, maximum during the execution, and afterward, may decrease.
- 在项目开始时,变化的成本是最低的,随着项目进一步的发展,它开始增加。
- 利益相关者在项目开始时,影响力更高,随着项目进一步的发展,它开始减少。
- 大多数资金和时间都是在执行阶段花费的。
Example
Suppose you have a project to build a new motorcycle.
首先你identify the stakeholders并收集要求。收集要求后,您将制定制造摩托车的计划。
然后,您开始建造摩托车的真正工作。
Finally, you will hand over this product to your client, and the project will be closed.
产品生命周期
产品生命周期描述了产品从概念到退休的阶段。
The stages of the product life cycle are development, introduction, growth, maturity, and retirement. These phases are sequential and do not overlap. The project life cycle can be a part of one or more phases in the product life cycle.
在开发阶段,您将产生想法并创建产品。
The introduction stage is for marketing the product and starting to sell the product to customers.
在增长阶段,销售额增加。
In the maturity stage, the product is accepted, and sales are at their peak.
The last stage is the retirement stage. At this level, you will try to sell out all of your inventory and move on to the next product. This stage happens due to technical advancement or because your product is not selling enough to support its production cost.
请注意,并非所有产品都进入最后阶段;有些被丢弃,有些则永远不会过期。
产品生命周期阶段没有持续时间限制,一个阶段可能比其他阶段更长。例如,丰田花冠和凯美瑞是旧产品,仍处于增长或成熟阶段,我看不到它们很快就会在退休阶段处于退休阶段。
A product life cycle can have many project life cycles. For example, the first project life cycle can be the development of the project, and the other, adding a function to the product.
In most cases, the project life cycle is a subset of the product life cycle because the product life cycle continues even after the project is completed.
Example
让我们考虑一下您公司想要推出的新摩托车的产品生命周期。
第一步是想法产生。这包括feasibility study,市场研究和业务计划。然后,您启动一个项目来制造这辆自行车。
Once the motorcycle is ready, your project is complete and the project life cycle ends. However, the product life cycle continues. Now the next phase of the product life cycle begins, and that is selling and marketing the motorcycle.
您将在销售后提供售后支持,最后,退休阶段开始了。
The retirement phase may include selling motorcycles at a discounted price.
在产品生命周期中,如果您在产品中添加新功能,您将为此过程创建一个新项目:例如,提高摩托车的发动机容量以支持更快的拾取速度。
项目和产品生命周期之间的差异
The following are a few differences between the project life cycle and the product life cycle:
- A product life cycle can have single or multiple projects.
- 产品生命周期比项目生命周期更长。
- The project life cycle has a definite end while the product life cycle may not.
- The map for the product life cycle is conceptual and depends on market conditions while projects have predictive and well-defined roadmaps.
- 产品生命周期阶段不会重叠,而项目阶段可能重叠。
- Phases generally occur only once in the product life cycle while in the project life cycle phases may repeat.
- 阶段在产品生命周期中是顺序的,而在项目生命周期阶段可能是或可能不是顺序的。
概括
项目生命周期是产品生命周期的一部分。项目生命周期通常是产品生命周期的子集。产品生命周期从想法的成立开始,并在产品退休时结束。该组织的业务模型取决于产品周期。产品生命周期包括产品的整个寿命,包括更新和升级,但是,在项目的帮助下,产品升级。
请在评论部分中分享您在项目或产品生命周期中的角色。
为什么项目经理需要同时了解两者?
A project manager needs to understand a lot more than these two.
The 5 process groups form the project management life cycle. Project life cycle is a series of phases, each of which can repeat or overlap the life cycle starting from inception feasibility, design, engineering, development, construction / manufacturing, commissioning to handover to operations or client. Product life cycle is a series of phases from introduction, growth, maturity to decline. Correct and agree?
你是对的乔。
如果我错了,请纠正我,我的理解是在执行过程中花费的大多数钱,以及在计划期间花费的大部分时间。
大部分资金和时间都是在执行阶段的花费。
感谢你的这篇文章。
I am working on an assessment of the Project Life Cycle. After some research I am confused, many resources suggest the Project Life Cycle has 5 phases (Initiate, Plan, Execute, Control and Close) – others define it as 4 phases (not including Control) and worded slightly different. Thoughts?
This is what I have explained in this blog post. What is your specific doubt?
由于法赫德,这是e of my favourite blog.
After reading this blog, now I got a good understanding between Project life cycle and Product life cycle.
您能否分享我的持续过程改进和过程改进计划之间的区别。
谢谢for your Help in advance…!
我已经注意到了这一点,很快就尝试撰写有关此主题的博客文章。
Dear Fahad,
感谢您发布文章。
但是我有一个查询,请澄清。
我了解的是启动,计划,执行,监控和控制和关闭和关闭是项目管理周期阶段,而不是项目生命周期阶段。
项目生命周期阶段(可能是根据博客产品生命周期阶段)完全取决于行业类型,无法普遍性化。
Mean to say project life cycle phases are one fit one.
The PMBOK Guide defines the project life cycles in four phases:
1)开始项目
2)组织和准备
3)进行项目工作,
4) Closing the project
无论行业如何,各种项目都是相同的。
Hi Fahad,
Looking for sample practice questions w.r.t. 8 new tasks added in 2016.
Any help is highly appreciated.
问候,
拉菲克
Hello Rafiq,
我没有任何针对这些新添加的任务的问题集,我怀疑您会在其他地方找到它。
Assalam-o-alaikum
Why Iterative life cycle and Incremental life cycle have same definition in PMBOK 5 Pg. 543 and 544
谢谢
Wasalaam,
阅读最后一句话,以清除两者之间的区别。
Dear Fahad,
Reading your blogs is an education in itself. You bring the complex explanations, translated to layman’s language and make these concepts edible. Always a pleasure to read your posts.
With warm regards
K.N.Jayanth Krishnamoorthy
Thank you Mr Krishnamoorthy for your comment.
Dear Fahad As per the PMBOK guide 5 edition Pg 39, is it correct to say the following:
Project life cycle has 4 phases:
1- starting the project (ie. initiation group)
2- Organizing and preparing (ie. Planning process group)
3- Carrying out project work (ie. Executing, Monitor &Control process group)
4- Closing (ie. Close process group).
在第38页PMBOmanbet最新版K指南中,它说项目生命周期的阶段通常是顺序的,但博客说这些阶段可以重叠。
PMBOKmanbet最新版指南还说,项目生命周期不应与过程组混淆。请指导。谢谢
假设您有一个大项目,并且已经分为阶段。您已经开始从事I阶段,进行计划,执行,控制然后关闭。此阶段已完成,可交付的可交付给客户。现在,您开始了II阶段,然后再次遵循计划阶段,执行阶段等。因此,您可以说阶段可以重叠。
The 5 process groups (initiation, planning, execution , monitor&control, closing) are NOT phases, like stated by PMBOK and quoted by Mohammed. Project lifecycle are what PMBOK states at pag. 38 and also reported by you: but process groups are not phases, so they cannot be a project lifecycle. That is what is written in the PMBOK, please stick on that. . Phases, for example in a usual automotive project lifecycle model could be: project preparation, concept detail, product&process development, production preparation, ramp up&close out. They are not the same as process groups, even if to some extent that can look like from the wording. Same process groups may happen several time at different project phases (for example, monitor&control process gorup), but process gorups are not phases…that is hwat is writte. And that is what you get if you really understand what is the difference between processes needed to manage a project vs. processes needed to develop a product or a service.
Corrected.
Dear Fahad,
谢谢for your pure clarification , you answer some questions that I try to understand ,
Now diffrence between project and product completely clear
谢谢again
You are welcome Nemat.
Dear Fahad,
PMBOK说:“过程组不是项目生命周期阶段”。但是我从您的博客中了解到的是,过程gropus不过是项目生命周期阶段。请澄清。
As per the PMBOK Guide fifth edition 2.4 page 38: A project life cycle is the series of phases that a project passes through from its initiation to its closure.